How to price as a freelancer: a worked project example

Start with a defined project, estimate the work as a range, and calculate the fee using your own rates. This guide shows the reasoning behind the numbers before you send a quote.

On this page
  1. 1. Make the scope specific enough to estimate
  2. 2. Estimate a low and a high number of hours
  3. 3. Set your rates and costs
  4. 4. Calculate three different prices
  5. 5. Respond to a lower budget by changing the work
  6. 6. Turn the decision into a client-ready quote
  7. Common pricing questions

1. Make the scope specific enough to estimate

“Build a website” leaves too much open. A useful brief states how many pages you will deliver, which features are included, who supplies the content and how feedback works. Add exclusions so both sides understand where the quoted work ends.

For example, a fictional software team needs one responsive launch page and a demo request form. It supplies approved copy and brand assets. The project includes two consolidated feedback rounds, form testing and handover notes. CRM automation, extra pages and ongoing maintenance are excluded.

2. Estimate a low and a high number of hours

Break the project into activities you can check. Include calls, revisions, testing and handover alongside production. Keep uncertain items visible instead of hiding them in a single optimistic estimate.

Fictional launch-page project
ActivityLow hoursHigh hours
Discovery and wireframes46
Design and build1216
Revisions46
Testing and handover46
Total2434

3. Set your rates and costs

Your minimum sustainable rate is an internal planning input. It should reflect the time you can actually sell and the business costs you need to cover. Your target rate is the rate you aim to charge. Use your own circumstances to set both figures.

In this fictional example, the minimum rate is $60 per hour, the target is $85 per hour, and direct project costs are $120. These figures demonstrate the calculation and are not a market-rate recommendation. Project-specific costs are added separately so they are not counted twice.

4. Calculate three different prices

Price floor: $1,560
24 low-end hours × $60 minimum rate + $120 costs. This covers the estimate only if delivery goes smoothly.
Walk-away price: $2,160
34 high-end hours × $60 minimum rate + $120 costs. In this method, this is the threshold below which you reduce the scope or decline the same project.
Recommended quote: $3,010
34 high-end hours × $85 target rate + $120 costs. Review the result against the project and the explanation you can give the client.

Keep the floor and walk-away price private. They help you make a decision. The client receives the agreed scope, fee, timeline and payment terms.

Calculate your own project price →

5. Respond to a lower budget by changing the work

If the client proposes $2,000, it is below the $2,160 walk-away price for the original scope. Discuss what can change. In our example, client-supplied approved wireframes reduce the confirmed estimate to 20–28 hours. The revised walk-away price is 28 × $60 + $120 = $1,800, and the target-rate quote is 28 × $85 + $120 = $2,500.

A $2,000 fee is now above the revised threshold but still below the target-rate quote. You decide whether to accept that trade. Record the reduced scope before agreeing to the lower amount.

6. Turn the decision into a client-ready quote

State the deliverables, revision limit, start conditions, fee and agreed payment schedule. Confirm any applicable taxes before sending. If you use an AI assistant to polish the wording, provide the approved numbers and ask it to flag missing terms.

Use our freelance quote template and completed example to put those details in order.

Common pricing questions

Should I charge hourly or use a project fee?

A defined project can be priced as a fixed fee using an internal hours estimate. If the scope is still changing, first agree how discovery, time and additional work will be handled. Choose the arrangement you can explain and deliver.

What if I cannot estimate the work?

List the unknowns. Ask for the information that changes the estimate, or define a smaller discovery phase before committing to the full project.

Does the calculator find the market price?

No. It calculates from the hours, rates and costs you supply. It does not research competitor prices or choose your final fee.

Prepare a reusable quote

Use the free template to describe your project and the price you have chosen.